Sub-series F: Site Drawings, 2000-2016
Scope and Contents Note
The collection comprises the records of the Campus Expansion Project and associated Clark offices. The records document building expansion projects at the Sterling and Francine Clark Art Institute from 1956 to 2017 (bulk dates), with a significant focus on the Tadao Ando designed expansion begun in 2001, in addition to building renovations, code compliance updates, and documentation pertaining to the original construction of all campus buildings. Documentation can include architectural plans, preliminary designs, consultant documentation, project team correspondence, certificates, contracts, permits, affidavits, etc.
Dates
- 2000-2016
Extent
9.708 Linear feet
Language of Materials
From the Collection: English
Arrangement Note
SITE DRAWINGS LIST:
36x44 inches
1. Arup – Phase 2 Site Lighting/Calculations – Permit (10/20/09)
24x36 inches
2. Water Feature (5/9/13) 3. Soil/Drainage/Planting/Grading (4/4/11 – 6/4/13) 4. Hill Engineers – Key Sheet Photo Reference (5/25/00) 5. Hill Engineers – Issued for Planning (5/18/05-6/28/12) –1 copy “A” and 1 copy “B” 6. Reed Hilderbrand – Various – Lighting Plan/Planting and Soils Plans/Pedestrian Circulation/General Site Plans (4/22 – 11/22/10) 7. Westall Architects – Retaining Wall and Details (12/19/07) 8. Reed Hilderbrand – Pedestrian Circulation Plan (11/22/10) 9. Reed Hilderbrand – Phase 2A/2B Site Plans (8/4/10) 10. Reed Hilderbrand – Phase 2 Site Plan/Pedestrian Movement Study (Decision Points and Gathering) (7/14/10) 11. Reed Hilderbrand – VE Water Feature Staking Plan (10/21/12) 12. Michael Singer – Studio Water Interactions Presentation (12/1/09) 13. Guntlow – As-Builts and Construction Control Documents (3/12/10 – 10/5/16)
18x24 inches
14. Soil/Drainage/Planting/Grading (4/4/11 – 6/4/13) 15. Issue for NOI (11/19/09) 16. Geothermal/Piping (4/13 – 8/27/12) 17. Geothermal (6/3 – 8/20/12) 18. Reed Hilderbrand – Water Feature (12/1/09) 19. Bulletin #35 – 100% for Construction – Site (1/29/13) 20. Bulletin #35 – 100% for Construction – Water Feature (1/29/13) 21. Bulletin #35 – 100% for Construction – Site Continued (1/30/13)
11x17 inches
22. Reed Hilderbrand – Phase 2 Drive Alternatives and Staging Studies – Proposed Scheme (11/27/07) 23. Reed Hilderbrand – Parking Count Phase 2 (11/27/07) 24. Reed Hilderbrand – Fire Truck Access (2/20/13) 25. Reed Hilderbrand – VE Site Plan: Base Bid (3/5/13) 26. Reed Hilderbrand – Proposed Signage Location (3/1/12) 27. Reed Hilderbrand – Illustrative/Cost-Saving Plans (3/1/12) 28. Reed Hilderbrand – Design Development – Phase 2 Site Plan (9/19/08) 29. Reed Hilderbrand – VE Site Plan: Alternate (3/5/13)
Repository Details
Part of the Sterling and Francine Clark Art Institute Archives Repository
