Skip to main content

Box 2

 Container

Contains 5 Results:

Service Building, Sterling and Francine Clark Art Institute, Maintenance and Operating Manuals Building Contract,, 1963

 undefined — Box: 2
Scope and Contents of the Records From the Collection:

This collection contains specification manuals for three buildings on the Clark campus: the service building, designed by Daniel Perry and built in the 1960s; the museum building, designed by Daniel Perry and completed in 1955; and the Manton building, designed by Pietro Belluschi and the Architects Collaborative and completed in 1973. The manuals detail all aspects of construction, including materials, HVAC systems, plumbing, etc.

Dates: 1963

Preliminary General Documents and Technical Specifications for Sterling and Francine Clark Art Institute, Williamstown, Massachusetts,, April 8, 1968

 undefined — Box: 2
Scope and Contents of the Records From the Collection:

This collection contains specification manuals for three buildings on the Clark campus: the service building, designed by Daniel Perry and built in the 1960s; the museum building, designed by Daniel Perry and completed in 1955; and the Manton building, designed by Pietro Belluschi and the Architects Collaborative and completed in 1973. The manuals detail all aspects of construction, including materials, HVAC systems, plumbing, etc.

Dates: April 8, 1968

General Documents and Technical Specifications, Sterling and Francine Clark Art Institute, Williamstown, Massachusetts, review copy,, April 7, 1969

 undefined — Box: 2
Scope and Contents of the Records From the Collection:

This collection contains specification manuals for three buildings on the Clark campus: the service building, designed by Daniel Perry and built in the 1960s; the museum building, designed by Daniel Perry and completed in 1955; and the Manton building, designed by Pietro Belluschi and the Architects Collaborative and completed in 1973. The manuals detail all aspects of construction, including materials, HVAC systems, plumbing, etc.

Dates: April 7, 1969

Operating and Maintenance Instructions, Clark Art Institute, Williamstown, Massachusetts,, October 1973

 undefined — Box: 2
Scope and Contents of the Records From the Collection:

This collection contains specification manuals for three buildings on the Clark campus: the service building, designed by Daniel Perry and built in the 1960s; the museum building, designed by Daniel Perry and completed in 1955; and the Manton building, designed by Pietro Belluschi and the Architects Collaborative and completed in 1973. The manuals detail all aspects of construction, including materials, HVAC systems, plumbing, etc.

Dates: October 1973

General Documents and Technical Specifications for Site Improvements at Sterling and Francine Clark Art Institute, Williamstown, Massachusetts,, June 14, 1968

 undefined — Box: 2
Scope and Contents of the Records From the Collection:

This collection contains specification manuals for three buildings on the Clark campus: the service building, designed by Daniel Perry and built in the 1960s; the museum building, designed by Daniel Perry and completed in 1955; and the Manton building, designed by Pietro Belluschi and the Architects Collaborative and completed in 1973. The manuals detail all aspects of construction, including materials, HVAC systems, plumbing, etc.

Dates: June 14, 1968